CANYON GRADE · SAMPLE PROJECT

Utility trench

Coordinate a trench route, access, and handoff with the installing trade.

Try an estimate for this project
Tracked excavator on a graded worksite in the desert
THE JOB

What the project involves.

A small project needs a new utility route from an existing service point to an outbuilding. The customer needs to coordinate timing and responsibilities between contractors.

  1. 01

    Identify the start and end points on a sketch or plan.

  2. 02

    Coordinate site markings, utility locations, and requirements with the project team.

  3. 03

    Confirm who handles installation, inspections, backfill, and surface restoration.

GET READY

What to have on hand.

These details help clarify the scope of a similar job.

  • Route sketch and estimated length
  • Utility type and installing contractor
  • Existing surfaces and known obstructions
Open the sample estimate